Executed Projects
20202020202020
Client and Project Location | Scope of work | Date of award |
Gujrat State Electricity Corporation(FPS) 1x800MW Wanakbori, Gujrat. | Handling at site stores / storage yard, transporting to site inspection, pre-assembly, erection, alignment, welding, NDT, fixing of hangers & Supports, water flushing, hydro testing, surface finish, supply & application of primer & Finish paints, Wrapping & coating including labeling & Flow direction on the equipment’s, piping & hangers and Supports, pre-commissioning, commissioning, trial operation & handing over to customer for piping of Fire Protection System and Fire Water Pump house Equipment etc. 1x800MW, Wanakbori TPS Unit#8 | 21-12-2017 |
NTPC, MUNPL Meja Thermal Power Project, Unit-I & Unit-II (2x660MW) Allahabad, UP. | Material handing & Unloading, Erection, Testing commissioning & final painting of ESP for 2x660MW for MUNPL, Meja Thermal Power project, Allahabad, UP. |
18-12-2013 |
Gujrat State Electricity Corporation (STG) 1x800MW Wanakbori, Gujrat. | Material from BHEL/ Clients Stores/ Storage yard; Transportation to site; Erection testing & commissioning, Trial Operation and handing over of steam turbine, Generator set, Integral Piping, HP/LP Heaters, Tanks & vessels, DG set, Pumps & Other BOI, Insulation, including supply and application of Final Painting ETC for 1x800MW GSECL Wanakbori Project at 1x800MW GSECL Wanakbori Project In Gujarat State. | 10-10-2017 |
Gujrat State Electrity Corporation(Boiler) 1x800MW Wanakbori, Gujrat. | Collection of Materials at BHEL/client’s storage yard/stores, Transportation to site, Erection, testing & assistance for commissioning, trail operation and handing over of boiler and its auxilliaries, APH,ducts&dampers,Fuel piping, boiler integral piping & associated valves SP,fans,power cycle piping, Coal mills & coal feeders,Insulation,final painting etc. | 17-12-2015 |
NTPC Gadarwara Super Thermal Power station 2X800MW , Gadarwara, MP.
|
Erection Alignment & Welding, Testing, Painting and Handing over of Bunker structure, Raw coal bunkers, Transfer points, trestles and conveyer galleries and misc, Civil Works for unit-1 at 2X800MW, NTPC Gadarwara Super thermal power station.
|
13-07-2015 |
NTPC Gadarwara Super Thermal Power station 2X800MW , Gadarwara, MP.
|
Supply of Materials for the works of MS embedments, Doors, Windows, Glazing, Roofing / Side Cladding, Rain Water Down Take Pipes, Structural Steel Painting, Gratings, Mild Steel Bolts, High Strength Structural Bolts, PTFE Bearings, MS Hand Railings, Concreting for Bunker Structures, Raw Coal Bunkers, Coal Handling Transfer Points for Unit-1 at 2X800MW NTPC Gadarwara STPP.
|
13-07-2015 |
Lanco vidharbha Thermal Power Project 2X660MW (Unit 1&2) at Mandhva Village,Wardha District, Maharashtra.
|
Erection, Testing, Commissioning of 2X660MW (Unit 1&2) Boiler & Auxiliaries at Lanco vidharbha Thermal Power Project, Mandhva village, Wardha dist. Maharashtra.
|
09-09-2015 |
Sintex Infra Project Ltd, Unit 1 & 2 of 2x150MW, Waghode, Shindkheda, Maharashtra.
|
Erection, Testing, Commissioning and handing over of Steam turbine, Turbo Generator, Condenser, TG Integral Piping,HP & LP Heaters, Deaerator, with associated Equipments/Tanks/Vessels, FST & Deaerator, LP Bypass system with associated platform, power cycle pumps & auxiliaries in Unit 1 & 2 of 2x150MW
|
26-02-2014 |
Visa Power Limited Unit 1 of 2X600 MW VPL, Deveri & Dumarpali, Raigarh District. Chattisgarh.
|
Erection, Testing, & Commissioning, Trial Operation and Handing over of Boiler and its Auxiliaries including ESP, Air Preheaters, Ducts and Dampers, Fans, Fuel Piping, Boiler Integral Piping, Power cycle piping, Chemical dozing system, Lining & Insulation, Final painting, etc of Unit 1 of 2 X 600 MW
|
22.07.2011 |
Rattan India Nasik Power Ltd (STG) 5X270MW Nasik, Maharashtra.
|
Receipt of Materials form BHEL/Storage yard, Handling at stores, site of work, Erection, Testing & commissioning of Steam Turbine and Auxiliaries etc Including bought items of 5x270MW, Nasik Thermal Power Project, Nasik, Maharashtra.
|
19-02-2016 |
Rattan India Nasik Power Ltd (Boiler, Piping & ESP) 5X270MW Nasik, Maharashtra.
|
Handling collection of Materials at BHEL/client’s storage yard/ stores, Transportation to site Erection, testing & assistance for commissioning, trail operation and handing over of boiler and its auxiliaries, APH, ducts dampers, Fuel piping, boiler integral piping & associated valves, ESP, fans, power cycle piping, Coal mills & coal feeders, insulation ,final painting etc of Unit #4 of 5X270MW Nasik TPS
|
25-01-2016 |
Gujrat State Electricity Corporation (R&M,ESP)1x210MW Wanakbori, Gujrat
|
R & M Dismantling of exiting ESP Internal & other components from BHEL/ customer storage to site of work and carrying out modification as required Erection, Testing & Commissioning and application of Insulation / Cladding for the work Renovation & Retrofitting of exiting ESP & Ducts for Unit #1 210Mw, Wanakbori, Gujarat.
|
03-11-2016 |
Lalitpur Thermal Power Station of Lalitpur Power Generation Company Limited 3X600MW, Lalitpur, UP.
|
Erection, Testing, Commissioning, Trial operation and handing over of steam turbine generator and its auxiliaries & piping etc. for package-B(Unit-2) at 3x660MW, Lalitpur TPS of Lalitpur, UP.
|
16-12-2013 |
Lalitpur Thermal Power Station of Lalitpur Power Generation Company Limited 3X600MW, Lalitpur, UP.
|
Erection, Testing, Commissioning, Trial operation and handing over of steam turbine generator and its auxiliaries & piping etc. for package-B(Unit-2) at 3x660MW, Lalitpur TPS of Lalitpur, UP.
|
16-12-2013 |
Maharashtra State Power Generation CoLtd
Chandrapur Super Thermal PowerStation Expn Project(2X500 MW),Chandrapur Maharashtra . |
Material handling & unloading, Erection, Testing and Commissioning of complete Boiler structures,Pressure parts,ESP,Fans,Power cycle piping,coal mills&feeders insulation & final painting of Unit 9,2×500 MW
|
23.01.2010 |
Krishak Bharati Cooperative Limited (KRIBHCO) Project, 1x72MW CPP Revamp KRIBHCO project, Hazira Village, Surat District, Gujarat.
|
Erection, Testing, Commissioning, Piping and final painting work for 1x72MW unit and Application of Thermal Insulation, Piping and Painting for 1×190 TPH Heat Recovery Generator.
|
03.10.2012 |
NTECL Vallur Thermal Power Project Kuruvimedu Village ponneri Taluk, Tamilnadu.
|
Erection, Testing, Commissioning & handing over of complete Power Cycle piping supplied under SG&TG packages,Insulation work of Boiler, Esp & Piping, accessories, associated equipment’s/systems, final painting for Phase 2 , Unit-3 1 x 500 MW
|
21-12-2012 |
Eleana Power & Infrastructure, 5x270MW, Amravati, Maharashtra.
|
Erection, Testing, commissioning and Handing over of Ducting, Rotating & Coal Piping of Unit – 5, 5x270MW, Amravati, Maharashtra.
|
30-10-2014 |
Eleana Power & Infrastructure, 5x270MW, Amravati, Maharashtra.
|
Erection, Testing, commissioning and Handing over of Ducting, Rotating & Coal Piping of Unit – 5, 5x270MW, Amravati, Maharashtra.
|
24-09-2014 |
Doosan Power Systems India Private Limited,2×685 MW Chhattisgarh Thermal Power Project Near Raikheda Village, Raipur District Chhattisgarh.
|
Critical Piping Erection, Testing and commissioning of complete and application for Units 1 and 2 of 2×685 MW Set.
|
23.07.2012 |
Korba West Power Company Limited, 1X600 MW KWPCL Avanta Raigarh Project, Near Bade Bhandar Village, Raigarh District. Chhattisgarh.
|
Erection, Testing & Assistance for commissioning, Trial Operation and Handing over of Steam Turbine and Generator Set and its Auxiliaries, HP/LP Heater and Painting, etc., of 1 X 600 MW
|
06.12.2011 |
Dainik Bhaskar Power Limited Unit 1 of 2×600 MW DBPL, Janjgir, Champa District. Chhattisgarh.
|
Erection, Testing, & Commissioning, Trial Operation and Handing over of Boiler and its Auxiliaries including ESP, Air Preheaters, Ducts and Dampers, Fans, Fuel Piping, Boiler Integral Piping, Power cycle piping, Chemical dozing system, Lining & Insulation, Final painting, etc. of Unit 1 of 2 X 600 MW
|
18.02.2011 |
NTECL Vallur Thermal Power Project Kuruvimedu Village Ponneri Taluk, Tamilnadu.
|
Erection, Testing, Commissioning & handing over of complete Power Cycle piping supplied under SG&TG packages, accessories, associated equipment’s/systems, final painting for Unit 1&2 of 2 x 500 MW
|
15.07.2010 |
NTECL Vallur Thermal Power Project Kuruvimedu Village Ponneri Taluk, Tamilnadu.
|
Erection, Testing, and commissioning of complete Boiler Structures, pressure parts, Non-Pressure parts , Rotating Machines including supply and Application of Final Painting for Unit # 2 of 2×500 MW set
|
20.05.2009 |
Gujarat State Energy Generation Ltd., Near Hazira,Village Mora, Dist. Surat , Gujarat .
|
Erection, Testing, Commissioning,Final Painting and Handing over of 1 x 292 TPH HRSG and its auxiliaries, Steel Stack, Piping etc, for 1×350 MW combined Power Plant at GSEG, Hazira ,Dist. Surat, Gujarat
|
18.03.2009 |
National Thermal Power Corporation / Korba super Thermal Power Station Korba, Chattisgarh .
|
Erection, Testing, Commissioning and handing over of complete Power cycle Piping including P-91 Material Piping etc, for Unit # 7 Stage III of 1 X 500 MW at Korba Super Thermal Power Station,
NTPC, Korba ,Chattisgarh. |
05.01.2009 |
Kakatiya Thermal, Power Project, Bhoopalapalli, Warrangal, Andhra Pradesh.
|
Erection, Testing and Commissioning of Power Cycle Piping of Unit 1×500 MW Boiler
|
02.06.2008 |
National Thermal Power Corporation / Korba
Super Thermal Power Station , Chattisgarh. |
Erection, Testing & Commissioning of Boiler and its auxiliaries, Rotating Machines including Mills and Fans, Duct, Fuel Piping etc., for Unit 7 of 1x 500 MW.
|
19.02.2007 |
Andhra Pradesh Power Generation Corporation Limited/Kakatiya Thermal Power Project, Warangal Andhra Pradesh.
|
Erection, Testing & Commissioning of Boiler Structures, Pressure Parts, Boiler Auxiliaries, Electrostatic Precipitator, Rotating Machines and supply and application of final Painting for Unit 1 of 1 x 500 MW
|
05.02.2007 |
Karnataka Power Corporation Limited / Bellary Thermal Power Project, Karnataka.
|
Erection, Testing & Commissioning of HP/ Power cycle Piping for SG and TG and supply and application of Painting for Unit 1 of 1x 500 MW set.
|
15.08.2006 |
National Thermal Power Corporation / Kahalgaon Super Thermal Power Project, Bihar .
|
Erection, testing & commissioning of Electrostatic Precipitator for Unit No. 5 of 1 x 500 MW.
|
22.12.2004 |
Karnataka Power Corporation Limited / Bellary Thermal Power Project, Karnataka
|
Erection, Testing and Commissioning of Structures, Pressure Parts, Non-Pressure Parts, Air Pre-heaters, Ducts including final Painting of Boiler for 1x 500 MW .
|
04.09.2004 |
National Thermal PowerCorporation / Kahalgaon Super Thermal Power Project, Bihar .
|
Erection, Testing & Commissioning of Boiler and its auxiliaries including Rotating Machinieries, Ducts & Fuel Oil Piping etc. of 500 MW for Unit 6 of 3×500 MW.
|
21.06.2004 |
National Thermal Power Corporation / Korba Super Thermal Power Station, Chatisgarh .
|
Economiser Bank Replacement and Associated jobs in Unit-6 Boiler & Reclamation of Economiser Coil in Boiler pressure parts of 500 MW
|
25.03.2004 |
Tamilnadu Electricity Board / Kuttalam Mayiladuthurai Taluk Tamilnadu.
|
Erection, Testing & Commissioning, application of Insulation of Heat Recovery Steam Generator and its auxiliaries, Piping of 101 MW Combined Cycle Power Plant.
|
03.01.2003 |
Aditya Cement / Shambhupura Dist. Chittorgarh Rajasthan .
|
Erection, Testing & Commissioning of 1×105 TPH AFBC Boiler and its Auxiliaries including Electrostatic Precipitator and 1×23 MW Steam
Generator and its Auxiliaries and Piping etc. |
16.03.2002 |
National Thermal Power Corporation / Talcher Super thermal Power Project,Orissa
|
Erection, Testing & Commissioning of Boiler for Stage II Unit-V of 4 x 500 MW .
|
06.08.2001 |
Hasdeo Thermal Power Station, CS Electricity Board, Korba West.
|
Overhauling of coal mills, raw coal feeders, coal bunkers, cleaning & servicing of Mill lube oil system, servicing of Mill gear box, Nitrogen Panels etc. of 2×210 MW boilers of unit no.3 & 4 .
|
16.06.2001 |
Hasdeo Thermal Power Station, CS Electricity Board, Korba West.
|
Overhauling of ID, FD & PA fans of 2×210 MW ABL make boilers of Unit 3 & 4 .
|
02.06.2001 |
Korba Super Thermal Power Station, NTPC, Korba.
|
Repair of boiler tubes and overhauling of soot blowers.
|
12.03.2001 |
Korba Super Thermal Power Station, NTPC, Korba.
|
Lowering of LTSH and other associated jobs in Unit VI,500 MW boiler .
|
12.06.2000 |
Haryana State Electricity Board / Faridabad Combined Power Plant, Haryana.
|
Erection, testing & commissioning, trail operation & handling over of 2×230 TPH HRSGs .
|
15.04.1999 |
Haryana State Electricity Board / Panipat Thermal Power station,Haryana
|
Erection, testing, commissioning and 1×210 MW Unit VI Boiler and Electrostatic Precipitator – Part-A and Part-B
|
24.08.1998 |
Uttarpradesh Electricity Board / Feroze Gandhi Thermal Power station Unchahar,Rai-bareily. U.P.
|
Erection, testing, commissioning & trial run of 2 x 210 MW boiler, auxiliaries.
|
21.01.1997 |
Hindustan Newsprints Limited / Kottayam Kerala .
|
Erection, testing & commissioning of 1×140 TPD chemical recovery boiler.
|
04.11.1996 |
Gujarat Electricity Board/ Wanakbori Thermal Power station, Gujarat .
|
Erection, testing & commissioning of 1×210 MW boiler, piping, Electrostatic Precipitator and their auxiliaries.
|
17.06.1996 |
Madras Refineries Ltd., Manli, Madras .
|
Erection, Testing and commissioning of 2×20 MW TG Sets and Auxiliaries.
|
02.09.1993 |
Cochin Refineries Ltd., Cochin, Kerala .
|
Fabrication & Erection of Piping & Equipments for Capacity Expansion Projects at CRL, Kerala.
|
06.04.1993 |
Dahanu Thermal Power Project, Maharashtra, BSES, Mumbai Ltd.
|
Erection, testing, commissioning & completion of trial operation of Electrostatic Precipitators for 2 x 250 MW Boiler
|
17.04.1992 |
Talcher Super Thermal Power Project, Kaniha, NTPC.
|
Erection, testing, commissioning & completion of trial operation of complete non-pressure parts like external structures, flue gas ducts, dampers, expansion joints in Unit I & II of 2 x 500 MW Boiler
|
10.04.1992 |
Talchar Super Thermal Power Project, Kaniha, NTPC.
|
Handling at Site Stories / Storage Yard, Transportation to Site of Work, pre-assembly, erection, testing, commissioning & completion of trial operation of rotating machines and its auxiliaries for Unit I of 2×500 MW Boiler
|
10.02.1992 |
National Aluminium company / Angul, Orissa.
|
Erection, testing, commissioning and completion of trial operation of Electrostatic Precipitator and its auxiliaries rotating equipment of Unit of VI Nalco CPP
|
04.10.1991 |
Tamilnadu Electricity Board / North Madras Thermal Power Project, Tamilnadu
|
Erection, testing and completion of trial opertion of Electrostatic Precipitators and its auxiliaries rotating equipment, ducts, dampers for the first two units of 2 x 210 MW .
|
06.03.1991 |
Engineers India Limited / Cochin Refineries Ltd., Kerala.
|
Erection, testing & commissioning of 1 x 60 T/H Heat Recovery Steam Generator including insulation for Cochin Refineries Ltd.
|
14.03.1990 |
National Thermal Power Corporation / Korba Super Thermal Power Project, Chhattisgarh,
Chatisgarh |
Erection, testing & commissioning of mills, fans & other auxiliaries & fuel piping of Unit VI of 3 x 500 MW.
|
09.03.1988 |
National Thermal Power Corporation / Ramagundam Super Thermal Power Station, Andhra Pradesh
|
Erection, testing & commissioning of Electrostatic Precipitator galleries & stairways of Unit VI of 3 x 500 MW
|
20.11.1987 |
Sathavahena ISPAT Ltd. Haresamudram Village, Anantapur, A.P.
|
Unloading, stacking, transportation, erection, testing & commissioning of 1 x15 TPH BF gas fired boiler.
|
20.09.1987 |
Tamil Nadu Electricity Board / Mettur Thermal Power Project, Mettur, Tamilnadu
|
Erection, testing & commissioning of Electrostatic Precipitator, rotating equipment, ducts & dampers for Unit I, II & IV of 2 x 210 MW
|
12.09.1984 |