Earlier Projects
Client and Project Location Scope of work Date of award Contract value (Indian Rupees) Date of completion
National Thermal Power Corporation / Korba super Thermal Power Station Korba, Chattisgarh .
Erection, Testing, Commissioning and handing over of complete Power cycle Piping including P-91 Material Piping etc, for Unit # 7 Stage III of 1 X 500 MW at Korba Super Thermal Power Station,
NTPC, Korba ,Chattisgarh.
05.01.2009 87,010,170 Completed
Kakatiya Thermal Power Project Bhoopalapalli, Warrangal, Andhra Pradesh
Erection, Testing, and commissioning of HP & LP Piping and its associated items/ Systems including Supply and Application of Final Painting of Unit 1 of 1x500 MW set at Kakatiya Thermal Power Project, (for APGENCO)
11.08.2008 98,781,800 Completed
National Thermal Power Corporation / Korba Super Thermal Power Station , Chattisgarh.
Erection, Testing & Commissioning of Boiler and its auxiliaries, Rotating Machines including Mills and Fans, Duct, Fuel Piping etc., for Unit 7 of 1x 500 MW.
19.02.2007 172,493,240 Completed
Andhra Pradesh Power Generation Corporation Limited/Kakatiya Thermal Power Project, Warangal Andhra Pradesh.
Erection, Testing & Commissioning of Boiler Structures, Pressure Parts, Boiler Auxiliaries, Electrostatic Precipitator, Rotating Machines and supply and application of final Painting for Unit 1 of 1 x 500 MW
05.02.2007 22,94,63,960 Completed
Karnataka Power Corporation Limited / Bellary Thermal Power Project, Karnataka.
Erection, Testing & Commissioning of HP/ Power cycle Piping for SG and TG and supply and application of Painting for Unit 1 of 1x 500 MW set.
05.05.2006 39,154,140 03.11.2008
National Thermal Power Corporation / Kahalgaon Super Thermal Power Project, Bihar .
Erection, testing & commissioning of Electrostatic Precipitator for Unit No. 5 of 1 x 500 MW.
22.12.2004 43,486,652 01.08.2008
Karnataka Power Corporation Limited / Bellary Thermal Power Project, Karnataka
Erection, Testing and Commissioning of Structures, Pressure Parts, Non-Pressure Parts, Air Pre-heaters, Ducts including final Painting of Boiler for 1x 500 MW .
04.09.2004 115,530,632 03.11.2008
National Thermal PowerCorporation / Kahalgaon Super Thermal Power Project, Bihar .
Erection, Testing & Commissioning of Boiler and its auxiliaries including Rotating Machinieries, Ducts & Fuel Oil Piping etc. of 500 MW for Unit 6 of 3x500 MW.  
21.06.2004 211,815,100 Completed
National Thermal Power Corporation / Korba Super Thermal Power Station, Chatisgarh .
Economiser Bank Replacement and Associated jobs in Unit-6 Boiler & Reclamation of Economiser Coil in Boiler pressure parts of 500 MW
25.04.2004 5,509,786 Completed
National Thermal Power Corporation / Korba Super Thermal Power Station, Chatisgarh
Overhauling of Boiler pressure parts, high pressure valves in Boiler area Stage-I & II & repair of Boiler tube failure and overhauling of soot Blowers of 3
x 500 MW
25.03.2004 4,231,275 Completed
Tamilnadu Electricity Board / Kuttalam Mayiladuthurai Taluk Tamilnadu.
Erection, Testing & Commissioning, application of Insulation of Heat Recovery Steam Generator and its auxiliaries, Piping of 101 MW Combined Cycle Power Plant.
03.01.2003 12,839,650 16.07.2004
Aditya Cement / Shambhupura Dist. Chittorgarh Rajasthan .
Erection, Testing & Commissioning of 1x105 TPH AFBC Boiler and its Auxiliaries including Electrostatic Precipitator and 1x23 MW Steam
Generator and its Auxiliaries and Piping etc.
16.03.2002 13,618,098 31.05.2003
National Thermal Power Corporation / Talcher Super thermal Power Project,Orissa
Erection, Testing & Commissioning of Boiler for Stage II Unit-V of 4 x 500 MW .
06.08.2001 112,440,704 Completed
National Thermal Power Corporation / Faridabad Combined Power plant, Haryana.
Erection, testing, commissioning, trial operation and handing over of 2 x 230 TPH HRSGs .
15.04.1999 56,948,700 15.12.2000
Haryana State Electricity Board / Panipat Thermal Power station,Haryana
Erection, testing, commissioning and 1x210 MW Unit VI Boiler and Electrostatic Precipitator - Part-A and Part-B
24.08.1998 69,616,020 15.01.2002
Gujarat Industries Power Corporation Limited / Surat Lignite Power Project,
Mangrol, Gujarat
Erection, testing, commisssioning and handing over of limestone milling system and pneumatic limestone conveying system etc.
09.12.1997 7,586,740 30.08.2000
Uttarpradesh Electricity Board / Feroze Gandhi Thermal Power station Unchahar,Rai-bareily. U.P.
Erection, testing, commissioning & trial run of 2 x 210 MW boiler, auxiliaries.
21.01.1997 31,920,000 03.05.2000
Hindustan Newsprints Limited / Kottayam Kerala .
Erection, testing & commissioning of 1x140 TPD chemical recovery boiler.
04.11.1996 7,802,020 30.09.1998
Gujarat Electricity Board/ Wanakbori Thermal Power station, Gujarat .
Erection, testing & commissioning of 1x210 MW boiler, piping, Electrostatic Precipitator and their auxiliaries.
17.06.1996 63,855,700 29.02.2000
National Aluminium company / Angul, Orissa.
Erection, testing, commissioning and completion of trial operation of Electrostatic Precipitator and its auxiliaries rotating equipment of Unit of VI Nalco CPP
04.10.1991 3,867,500 10.12.1994
Tamilnadu Electricity Board / North Madras Thermal Power Project, Tamilnadu
Erection, testing and completion of trial opertion of Electrostatic Precipitators and its auxiliaries rotating equipment, ducts, dampers for the first two units of 2 x 210 MW .
06.03.1991 11,578,500 31.10.1995
Engineers India Limited / Cochin Refineries Ltd., Kerala.
Erection, testing & commissioning of 1 x 60 T/H Heat Recovery Steam Generator including insulation for Cochin Refineries Ltd.
14.03.1990 3,907,750 15.04.1991
Tamilnadu Electricity Board / Tuticorin Thermal Power Station, Tamilnadu
Erection, testing & commissioning of mills, fans Electrostatic Precipitator, ducts & connected structurals of IV & V of 2 x 210 MW stage III
05.04.1988 7,524,000 15.06.1992
National Thermal Power Corporation / Korba Super Thermal Power Project,
Chatisgarh
Erection, testing & commissioning of mills, fans & other auxiliaries & fuel piping of Unit VI of 3 x 500 MW.
09.03.1988 3,476,295 24.02.1990
National Thermal Power Corporation / Ramagundam Super Thermal Power Station, Andhra Pradesh
Erection, testing & commissioning of Electrostatic Precipitator galleries & stairways of Unit VI of 3 x 500 MW
20.09.1987 4,865,000 24.10.1990
Tamil Nadu Electricity Board / Mettur Thermal Power Project, Mettur, Tamilnadu
Erection, testing & commissioning of Electrostatic Precipitator, rotating equipment, ducts & dampers for Unit I, II & IV of 2 x 210 MW
12.09.1984 10,932,916 25.06.1986
 
 