Heavy Equipments
| Heavy Cranes |
| 150 Ton Fuwa Hydralic Crawler Crane |
1 |
| 150 Ton IHI Crawler Crane |
1 |
| 100 Ton Fuwa Hydralic Crawler Crane |
1 |
| 80 Ton Fuwa Hydralic Crawler Crane |
2 |
| 75 Ton Tata TFC Crawler Crane |
3 |
| 70 Ton Zoomlion Crawler Crane |
3 |
| 45 Ton NCK 41 B Crawler Crane |
3 |
| 40 Ton Tyre Mountetd Crawler Crane |
2 |
| 35 Ton P & H 655 Crawler Crane |
2 |
| 35 Ton Fuwa Crawler Crane |
4 |
| 25 Ton Tata TFC – 75 Crawler Crane |
3 |
| 20 Ton Tata P & H 320 Crawler Crane |
2 |
| 18 Ton Tata 320 Crawler Crane |
4 |
| Mobile Cranes |
| 18 Ton Hydra |
4 |
| 14 Ton Hydra |
8 |
| 12 Ton Hydra |
13 |
| 11 Ton Hydra |
2 |
| 10 Ton Hydra |
3 |
| 08 Ton Hydra |
3 |
| Transport Vehicle |
| Tractor Hindustan, HMT |
6 |
| Trailer Ashok Leyland |
9 |
| Trailer with Horse |
5 |
| Pick Van / Load King / Tata ACE |
5 |
| Mini Bus |
4 |
| Jeep (Sumo, Bolero, Etc) |
15 |
| Omini Ambulance |
1 |
| Lifting Equipments |
| Rack & Pinion Elevator PC 130-7 (Passenger Lift) |
4 |
| Electrical Winches (1 Ton-15 Ton) |
85 |
| Chain Pulley Blocks (1 Ton-25 Ton) |
786 |
| Max Puller (Hook Chucks (1.6 Ton-5Ton)) |
81 |
| Lath Machine |
1 |
| Surface Grinder |
1 |
| Wire Rope Sling 90 MM X 16 Mtrs |
2 |
| Wire Rope Sling 80 MM X 18 Mtrs |
6 |
| Wire Rope Sling 80 MM X 16 Mtrs |
6 |
| Wire Rope Pulley 5 Sheave 50 Ton |
12 |
| Wire Rope Pulley 4/5 Sheave 25 Ton |
24 |
| Beam Lifting Clamps (3 Ton-10Ton) |
25 |
| Scaff Holding Material |
| Pipes (assorted Lift) |
6000 |
| Right angle Couples |
8000 |
| Scaffolding Platform |
1000 |
| Beam Brackets |
500 |
| Swivel Couples |
3000 |
| Other Major Equipments |
| Pipe Bending Machine Heavy Duty |
6 |
| Tube Bending Machine |
4 |
| Hydraulic Test Pumps Heavy Duty |
4 |
| Air Compressors |
4 |
| Electrode Backing Oven |
21 |
| High Intensity Illuminator |
5 |
| Impact Wrench GDS 30 |
8 |
| MS Rail |
33 |
| Plasma Cutting Machine |
4 |
| Torque Wrench Assorted (750 LBS-2400 LBS) |
44 |
| Steel Containers (20 Ft-40 Ft with Furnished) |
46 |
Welding & NDT Equipments
| Welding & NDT Equipments |
| Welding Generators (K-320/45) |
66 |
| Welding Rectifier 450/600A |
361 |
| Welding Transformer 400/6A |
25 |
| Welding Inverter |
30 |
| Diesel Power Generator |
5 |
| SR Panel Board |
12 |
| Temperature Recorder |
19 |
| Theodolite with stand |
7 |
| Hardness Tester |
2 |
| Induction Heat Machine (Miller) |
5 |
| Mig Welding Machine |
8 |
| Orbital Welding Machine |
2 |
|
|
|
 |
|
 |
|
| Udangudi,STPP,(UNIT#2 at 2x660 MW) Tuticorin District,Tamil Nadu(Boiler /ESP/ Bunker) | | Erection, Testing and assistance forcommissioning & Trial Operation includingapplication of Insulation, Refractory, supply &touch-up painting of Boiler, ESP & auxiliaries,Detailed engineering, fabrication, Erection ofBunker along with Supply & installation of itemas per BOQ of UNIT#2 at 2x660 MW UdangudiSTPP, Tuticorin District,Tamil Nadu |
|
Patratu Thermal Power Station UNIT#2 3x800MW Patratu STPP,Jharkhand.(Boiler / Bunker).
|
|
Erection, Testing and assistance for commissioning & Trial Operation including application of Insulation, Refractory, supply & touch-up painting of Boiler & auxiliaries, Bunker package at UNIT#2 at 3X800 MW PVUNL PROJECT Patratu. |
|
North Chennai Thermal Power project 1x800MW North Chennai, Tamil Nadu.(STG)
|
|
Handling of Materials at BHEL/Client’s Stores/Storage Yard in one or more location outside plant premises and transportation to site of Erection, Erection, Testing & Assistance for commissioning and Trial Operation including supply and application of final painting of Steam Turbine, Turbo Generator & its auxiliaries including BOIs etc., at 1 x 800 MW North Chennai TPS Stage III
|
|
Doosan Power System India Private Ltd. 2x660MW Jawaharpur, Uttar Pradesh.
|
|
Erection, Testing, Commissioning and handing over of Unit #1 & 2 Boiler, Power Cycle Piping package of 2x660MW Jawaharpur Super Thermal Power Station, Uttar Pradesh.
|
|
Ennore SEZ Thermal power project (boiler) unit-1 2x660MW,Chennal, Tamil Nadu
|
|
Erection, Testing, Commissioning of Ennore SEZ Thermal power project (boiler) unit-1 2x660MW,Chennal, Tamil Nadu
|
|
Gujrat State Electricity Corporation(FPS) 1x800MW Wanakbori, Gujrat
|
|
Handling at site stores / storage yard, transporting to site inspection, pre-assembly, erection, alignment, welding, NDT, fixing of hangers & Supports, water flushing, hydro testing, surface finish, supply & application of primer & Finish paints, Wrapping & coating including labeling & Flow direction on the equipment’s, piping & hangers and Supports, pre-commissioning, commissioning, trial operation & handing over to customer for piping of Fire Protection System and Fire Water Pump house Equipment etc. 1x800MW, Wanakbori TPS Unit#8
|
|
|
|
 |
|
 |
|
|
 |
|
 |
|
| Infrastructure is the crux of any nation and Power is a critical component in it. Texcel plays a major role in this high capital |
|
|
|
 |
|
 |
|
|
|
|