Home | Sitemap
ISO 9001:2008 Company  
 
Active role in infrastructure development, especially in the energy sector.
Technical excellence, innovativeness and adaptability to an ever-changing industrial scenario.
Our Team   Projects
Quality   Contact Us
 
 
Infrastructure

Heavy Equipments
Heavy Cranes
150 Ton Fuwa Hydralic Crawler Crane 1
150 Ton IHI Crawler Crane 1
100 Ton Fuwa Hydralic Crawler Crane 1
80 Ton Fuwa Hydralic Crawler Crane 2
75 Ton Tata TFC Crawler Crane 3
70 Ton Zoomlion Crawler Crane 3
45 Ton NCK 41 B Crawler Crane 3
40 Ton Tyre Mountetd Crawler Crane 2
35 Ton P & H 655 Crawler Crane 2
35 Ton Fuwa Crawler Crane 4
25 Ton Tata TFC – 75 Crawler Crane 3
20 Ton Tata P & H 320 Crawler Crane 2
18 Ton Tata 320 Crawler Crane 4

Mobile Cranes
18 Ton Hydra 4
14 Ton Hydra 8
12 Ton Hydra 13
11 Ton Hydra 2
10 Ton Hydra 3
08 Ton Hydra 3

Transport Vehicle
Tractor Hindustan, HMT 6
Trailer Ashok Leyland 9
Trailer with Horse 5
Pick Van / Load King / Tata ACE 5
Mini Bus 4
Jeep (Sumo, Bolero, Etc) 15
Omini Ambulance 1

Lifting Equipments
Rack & Pinion Elevator PC 130-7 (Passenger Lift) 4
Electrical Winches (1 Ton-15 Ton) 85
Chain Pulley Blocks (1 Ton-25 Ton) 786
Max Puller (Hook Chucks (1.6 Ton-5Ton)) 81
Lath Machine 1
Surface Grinder 1
Wire Rope Sling 90 MM X 16 Mtrs 2
Wire Rope Sling 80 MM X 18 Mtrs 6
Wire Rope Sling 80 MM X 16 Mtrs 6
Wire Rope Pulley 5 Sheave 50 Ton 12
Wire Rope Pulley 4/5 Sheave 25 Ton 24
Beam Lifting Clamps (3 Ton-10Ton) 25

Scaff Holding Material
Pipes (assorted Lift) 6000
Right angle Couples 8000
Scaffolding Platform 1000
Beam Brackets 500
Swivel Couples 3000

Other Major Equipments
Pipe Bending Machine Heavy Duty 6
Tube Bending Machine 4
Hydraulic Test Pumps Heavy Duty 4
Air Compressors 4
Electrode Backing Oven 21
High Intensity Illuminator 5
Impact Wrench GDS 30 8
MS Rail 33
Plasma Cutting Machine 4
Torque Wrench Assorted (750 LBS-2400 LBS) 44
Steel Containers (20 Ft-40 Ft with Furnished) 46

Welding & NDT Equipments
Welding & NDT Equipments
Welding Generators (K-320/45) 66
Welding Rectifier 450/600A 361
Welding Transformer 400/6A 25
Welding Inverter 30
Diesel Power Generator 5
SR Panel Board 12
Temperature Recorder 19
Theodolite with stand 7
Hardness Tester 2
Induction Heat Machine (Miller) 5
Mig Welding Machine 8
Orbital Welding Machine 2
 
Udangudi,STPP,(UNIT#2 at 2x660 MW) Tuticorin District,Tamil Nadu(Boiler /ESP/ Bunker)
Erection, Testing and assistance forcommissioning & Trial Operation includingapplication of Insulation, Refractory, supply &touch-up painting of Boiler, ESP & auxiliaries,Detailed engineering, fabrication, Erection ofBunker along with Supply & installation of itemas per BOQ of UNIT#2 at 2x660 MW UdangudiSTPP, Tuticorin District,Tamil Nadu
Patratu Thermal Power Station UNIT#2 3x800MW Patratu STPP,Jharkhand.(Boiler / Bunker).
Erection, Testing and assistance for commissioning & Trial Operation including application of Insulation, Refractory, supply & touch-up painting of Boiler & auxiliaries, Bunker package at UNIT#2 at 3X800 MW PVUNL PROJECT Patratu.
North Chennai Thermal Power project 1x800MW North Chennai, Tamil Nadu.(STG)
Handling of Materials at BHEL/Client’s Stores/Storage Yard in one or more location outside plant premises and transportation to site of Erection, Erection, Testing & Assistance for commissioning and Trial Operation including supply and application of final painting of Steam Turbine, Turbo Generator & its auxiliaries including BOIs etc., at 1 x 800 MW North Chennai TPS Stage III
Doosan Power System India Private Ltd. 2x660MW Jawaharpur, Uttar Pradesh.
Erection, Testing, Commissioning and handing over of Unit #1 & 2 Boiler, Power Cycle Piping package of 2x660MW Jawaharpur Super Thermal Power Station, Uttar Pradesh.
Ennore SEZ Thermal power project (boiler) unit-1 2x660MW,Chennal, Tamil Nadu
Erection, Testing, Commissioning of Ennore SEZ Thermal power project (boiler) unit-1 2x660MW,Chennal, Tamil Nadu
Gujrat State Electricity Corporation(FPS) 1x800MW Wanakbori, Gujrat
Handling at site stores / storage yard, transporting to site inspection, pre-assembly, erection, alignment, welding, NDT, fixing of hangers & Supports, water flushing, hydro testing, surface finish, supply & application of primer & Finish paints, Wrapping & coating including labeling & Flow direction on the equipment’s, piping & hangers and Supports, pre-commissioning, commissioning, trial operation & handing over to customer for piping of Fire Protection System and Fire Water Pump house Equipment etc. 1x800MW, Wanakbori TPS Unit#8
Know More
Infrastructure is the crux of any nation and Power is a critical component in it. Texcel plays a major role in this high capital
Know More
                                                                      
Know More
 
 
© Copyright Texcel Engineers
All rights reserved Various trademarks held by their respective owners
Site designed by Pixel avatar