Heavy Equipments
Heavy Cranes |
150 Ton Fuwa Hydralic Crawler Crane |
1 |
150 Ton IHI Crawler Crane |
1 |
100 Ton Fuwa Hydralic Crawler Crane |
1 |
80 Ton Fuwa Hydralic Crawler Crane |
2 |
75 Ton Tata TFC Crawler Crane |
3 |
70 Ton Zoomlion Crawler Crane |
3 |
45 Ton NCK 41 B Crawler Crane |
3 |
40 Ton Tyre Mountetd Crawler Crane |
2 |
35 Ton P & H 655 Crawler Crane |
2 |
35 Ton Fuwa Crawler Crane |
4 |
25 Ton Tata TFC – 75 Crawler Crane |
3 |
20 Ton Tata P & H 320 Crawler Crane |
2 |
18 Ton Tata 320 Crawler Crane |
4 |
Mobile Cranes |
18 Ton Hydra |
4 |
14 Ton Hydra |
8 |
12 Ton Hydra |
13 |
11 Ton Hydra |
2 |
10 Ton Hydra |
3 |
08 Ton Hydra |
3 |
Transport Vehicle |
Tractor Hindustan, HMT |
6 |
Trailer Ashok Leyland |
9 |
Trailer with Horse |
5 |
Pick Van / Load King / Tata ACE |
5 |
Mini Bus |
4 |
Jeep (Sumo, Bolero, Etc) |
15 |
Omini Ambulance |
1 |
Lifting Equipments |
Rack & Pinion Elevator PC 130-7 (Passenger Lift) |
4 |
Electrical Winches (1 Ton-15 Ton) |
85 |
Chain Pulley Blocks (1 Ton-25 Ton) |
786 |
Max Puller (Hook Chucks (1.6 Ton-5Ton)) |
81 |
Lath Machine |
1 |
Surface Grinder |
1 |
Wire Rope Sling 90 MM X 16 Mtrs |
2 |
Wire Rope Sling 80 MM X 18 Mtrs |
6 |
Wire Rope Sling 80 MM X 16 Mtrs |
6 |
Wire Rope Pulley 5 Sheave 50 Ton |
12 |
Wire Rope Pulley 4/5 Sheave 25 Ton |
24 |
Beam Lifting Clamps (3 Ton-10Ton) |
25 |
Scaff Holding Material |
Pipes (assorted Lift) |
6000 |
Right angle Couples |
8000 |
Scaffolding Platform |
1000 |
Beam Brackets |
500 |
Swivel Couples |
3000 |
Other Major Equipments |
Pipe Bending Machine Heavy Duty |
6 |
Tube Bending Machine |
4 |
Hydraulic Test Pumps Heavy Duty |
4 |
Air Compressors |
4 |
Electrode Backing Oven |
21 |
High Intensity Illuminator |
5 |
Impact Wrench GDS 30 |
8 |
MS Rail |
33 |
Plasma Cutting Machine |
4 |
Torque Wrench Assorted (750 LBS-2400 LBS) |
44 |
Steel Containers (20 Ft-40 Ft with Furnished) |
46 |
Welding & NDT Equipments
Welding & NDT Equipments |
Welding Generators (K-320/45) |
66 |
Welding Rectifier 450/600A |
361 |
Welding Transformer 400/6A |
25 |
Welding Inverter |
30 |
Diesel Power Generator |
5 |
SR Panel Board |
12 |
Temperature Recorder |
19 |
Theodolite with stand |
7 |
Hardness Tester |
2 |
Induction Heat Machine (Miller) |
5 |
Mig Welding Machine |
8 |
Orbital Welding Machine |
2 |
|
|
|
|
|
|
|
Udangudi,STPP,(UNIT#2 at 2x660 MW) Tuticorin District,Tamil Nadu(Boiler /ESP/ Bunker) | Erection, Testing and assistance forcommissioning & Trial Operation includingapplication of Insulation, Refractory, supply &touch-up painting of Boiler, ESP & auxiliaries,Detailed engineering, fabrication, Erection ofBunker along with Supply & installation of itemas per BOQ of UNIT#2 at 2x660 MW UdangudiSTPP, Tuticorin District,Tamil Nadu |
Patratu Thermal Power Station UNIT#2 3x800MW Patratu STPP,Jharkhand.(Boiler / Bunker).
|
Erection, Testing and assistance for commissioning & Trial Operation including application of Insulation, Refractory, supply & touch-up painting of Boiler & auxiliaries, Bunker package at UNIT#2 at 3X800 MW PVUNL PROJECT Patratu. |
North Chennai Thermal Power project 1x800MW North Chennai, Tamil Nadu.(STG)
|
Handling of Materials at BHEL/Client’s Stores/Storage Yard in one or more location outside plant premises and transportation to site of Erection, Erection, Testing & Assistance for commissioning and Trial Operation including supply and application of final painting of Steam Turbine, Turbo Generator & its auxiliaries including BOIs etc., at 1 x 800 MW North Chennai TPS Stage III
|
Doosan Power System India Private Ltd. 2x660MW Jawaharpur, Uttar Pradesh.
|
Erection, Testing, Commissioning and handing over of Unit #1 & 2 Boiler, Power Cycle Piping package of 2x660MW Jawaharpur Super Thermal Power Station, Uttar Pradesh.
|
Ennore SEZ Thermal power project (boiler) unit-1 2x660MW,Chennal, Tamil Nadu
|
Erection, Testing, Commissioning of Ennore SEZ Thermal power project (boiler) unit-1 2x660MW,Chennal, Tamil Nadu
|
Gujrat State Electricity Corporation(FPS) 1x800MW Wanakbori, Gujrat
|
Handling at site stores / storage yard, transporting to site inspection, pre-assembly, erection, alignment, welding, NDT, fixing of hangers & Supports, water flushing, hydro testing, surface finish, supply & application of primer & Finish paints, Wrapping & coating including labeling & Flow direction on the equipment’s, piping & hangers and Supports, pre-commissioning, commissioning, trial operation & handing over to customer for piping of Fire Protection System and Fire Water Pump house Equipment etc. 1x800MW, Wanakbori TPS Unit#8
|
|
|
|
|
|
|
|
|
|
|
|
|
Infrastructure is the crux of any nation and Power is a critical component in it. Texcel plays a major role in this high capital |
|
|
|
|
|
|
|
|
|
|